Zero Downtime Office Moves

IT Relocation
Done Professionally

Moving office? We handle your entire IT infrastructure — servers, workstations, networks, and cabling. Ready to work on day one.

Zero
Downtime Target
End-to-End
Move Management
£5M
Public Liability
11+
Years in London

Moving office is stressful. IT shouldn't be.

We solve the primary challenges businesses face during relocation, from connectivity gaps to hardware protection.

Zero Downtime

Every hour offline costs money. We plan moves to ensure your team is operational by Monday morning.

Secure Handling

Fragile servers and expensive workstations are packed in anti-static materials and moved in air-ride vehicles.

Connectivity Experts

Fibre installation in London takes 6-9 months. We audit your new site early and provide 4G/5G failover if needed.

Single Point of Contact

We coordinate with ISPs, cabling contractors, and removal companies so you don't have to.

Our Three-Phase Approach

Meticulous planning and execution for a seamless transition.

Phase 1

Pre-Move Planning

Comprehensive audit and planning to ensure zero surprises on moving day.

Site Survey

Full assessment of both current and new locations.

Connectivity Check

Verify fibre availability (warning: 6-9 month lead times).

Desk Mapping

Plan workstation positions and cable runs.

Infrastructure Audit

Document all servers, workstations, and network gear.

Phase 2

Move Day Execution

Professional de-installation, secure transport, and complete reinstallation.

Secure Transport

Air-ride vehicles, anti-static packing, and GPS tracking.

Server Room Setup

Rack installation, power distribution, and cooling checks.

Workstation Setup

Per-user installation of monitors and peripherals.

Network Config

Switches, routers, firewalls, and WiFi access points.

Phase 3

Post-Move Support

We don't leave until everything works. Plus ongoing support for the critical first days.

Connection Testing

Verify every workstation, printer, and phone.

Day-One Support

On-site technician for immediate troubleshooting.

Staff Orientation

Quick briefing on the new setup and any changes.

Documentation

Updated network diagrams and asset registers.

Simple, Scalable Pricing

Predictable costs for any size office move.

Small Office

1-10 Users

From
£1,500+VAT
  • ✓ Pre-move site survey
  • ✓ All workstations moved
  • ✓ Network equipment relocation
  • ✓ Day-one support included
Get Quote
MOST COMMON

Medium Office

10-50 Users

From
£4,000+VAT
  • ✓ Full infrastructure audit
  • ✓ Detailed project management
  • ✓ Server room migration
  • ✓ Structured cabling
  • ✓ 72-hour priority support
Get Quote

Large Office

50+ Users

From
£15,000+VAT
  • ✓ Dedicated project manager
  • ✓ Phased migration planning
  • ✓ Comms room build-out
  • ✓ Multi-day migration support
Get Quote

Relocation FAQ

How long does an IT relocation take?

Most small and medium moves (up to 50 users) complete over a single weekend (Friday PM to Sunday PM). Larger moves are often phased over multiple weekends.

What if internet isn't ready at the new site?

This is common in London. We audit connectivity 4-6 weeks out. If the ISP is delayed, we deploy interim 4G/5G business failover to keep you working.

Are you insured for equipment damage?

Yes. We are fully insured with £5M Public Liability and specific Goods in Transit cover up to £100k+ per move.

Do you handle the physical furniture move?

We specialize in IT only. However, we work closely with commercial removal companies and can coordinate the entire project through our partner network.

Plan your move today

Get a detailed quote within 48 hours of your site survey.